Barriers keep performing as designed for the life of the asset. They are inspected, tested, maintained and independently verified, and degradation is found and managed before it matters. When a barrier is impaired, that is known and recorded, and the risk is assessed.
The question this lens asks
“Does this document create a barrier against a major accident, keep one working, keep work inside one, or build the people who do?”
Belongs here
- Integrity management of structures, pipelines, pressure systems and wells
- Maintenance and testing strategies for safety critical equipment
- Verification and written schemes of examination; well examination
- Inspection results, integrity reporting and ageing and life extension
- Barrier status, equipment criticality and critical spares
Does not belong here
- How the barrier was specified in the first place (Design integrity)
- Who is competent to maintain it (People and culture)
Documents by department (20)
Engineering 9
- STPlant Maintenance ScheduleReactor unitIAEA GSR Part 2 · 10 · ONR Licence Conditions · EMIT · Nuclear Safety Case · Safety Systems
- STIn-service Inspection ProgrammeReactor unitIAEA GSR Part 2 · 10 · ONR Licence Conditions · EMIT
- STAgeing Management ProgrammeStationIAEA GSR Part 2 · 10 · ONR Licence Conditions · EMIT
- STPressure Systems Written Scheme of ExaminationStationIAEA GSR Part 2 · 10 · ONR Licence Conditions · EMIT
- PRExamination, Inspection, Maintenance and Testing ProcedureIAEA GSR Part 2 · 10 · ONR Licence Conditions · EMIT
- PRReactor Pressure Vessel Integrity AssessmentReactor unitIAEA GSR Part 2 · 10 · ONR Licence Conditions · EMIT
- PREquipment Reliability ProcessIAEA GSR Part 2 · 10 · ONR Licence Conditions · EMIT
- PRObsolescence Management ProcedureIAEA GSR Part 2 · 10 · ONR Licence Conditions · EMIT
- PRPeriodic Test Procedures: Reactor Protection SystemReactor unitIAEA GSR Part 2 · 10 · ONR Licence Conditions · EMIT
Operations & Maintenance 7
- STMaintenance Strategy StandardIAEA GSR Part 2 · 10 · ONR Licence Conditions · EMIT
- STOutage Management StandardStationIAEA GSR Part 2 · 04 · ONR Licence Conditions · Periodic shutdown
- PRWork Management ProcessStationIAEA GSR Part 2 · 10 · ONR Licence Conditions · EMIT
- PRSurveillance Test Scheduling ProcedureStationIAEA GSR Part 2 · 10 · ONR Licence Conditions · EMIT
- PRFire Protection Surveillance ProcedureStationIAEA GSR Part 2 · 10 · ONR Licence Conditions · EMIT
- PRPeriodic Shutdown PlanReactor unitIAEA GSR Part 2 · 04 · ONR Licence Conditions · Periodic shutdown
- SUMaintenance Work Order Close-out RecordStationIAEA GSR Part 2 · 08 · ONR Licence Conditions · Operational records
Radiological Protection 1
- PRRadiation Monitoring Instrument CalibrationStationIAEA GSR Part 2 · 10 · ONR Licence Conditions · EMIT
Commercial 2
- STSpares and Materials Management StandardStationIAEA GSR Part 2 · 10 · ONR Licence Conditions · EMIT
- PRCounterfeit, Fraudulent and Suspect Items ProcedureIAEA GSR Part 2 · 11 · ONR Licence Conditions · Management systems
Business Services 1
- STPlant Information and Maintenance Management System StandardStationIAEA GSR Part 2 · 08 · ONR Licence Conditions · Operational records