Element 07×Subsurface

Subsurface in Procedures

Plans and Procedures

This element holds the subsurface workflows — repeatable processes for studies, FDPs, reserves booking and annual review.

Process, procedure, work instruction 5

  • Pressure Data ProcedureIn 1 of 3 operator registersCompany-wideAlso in EI PSM · 07 Documentation, records and knowledge managementNot process safetyNot safety case critical
  • Geological Samples Data Flow ProcedureIn 1 of 3 operator registersCompany-wideAlso in EI PSM · 07 Documentation, records and knowledge managementNot process safetyNot safety case critical
  • Chemostratigraphy Report ProcedureIn 1 of 3 operator registersCompany-wideAlso in EI PSM · 11 Standards and practicesNot process safetyNot safety case critical
  • Prospect and Resource Probability Assessment MethodologyIn 1 of 3 operator registersCompany-wideAlso in EI PSM · 11 Standards and practicesNot process safetyNot safety case critical
  • Production System Optimisation Methods ProcedureIn 1 of 3 operator registersCompany-wideAlso in EI PSM · 08 Operating manuals and proceduresNot process safetyNot safety case critical

Guidance · outside the system 1

Informative, not a “shall”. These belong in the knowledge base, not the management system. How this works →

  • Operations Geology GuidelineTypical exampleCompany-wideAlso in EI PSM · 11 Standards and practicesNot process safetyNot safety case critical
"This translates standards into repeatable workflows."
  • →The standard the workflow implements — (Policies and Standards)E02 Policies
  • →The execution of the study itself — (Execution of Activities)E08 Execution
  • →The post-study review — (Monitoring, Reporting and Learning)E09 Monitoring