Safety Case · What could go wrong, and why the risk is tolerable

Major accident hazards and risk

How major accident hazards are identified, how risk is evaluated, and the criteria against which the case argues that risk is as low as reasonably practicable. A change to a method or a criterion can change every conclusion that rests on it.

“If this document changed, would the safety case need to be revised and accepted by the competent authority before the change could be made?”

  • Major accident hazard management standard
  • Formal safety assessment and quantitative risk assessment
  • Risk acceptance criteria and ALARP demonstration
  • Bowtie standard
  • Task and occupational risk assessment
  • General HSSE risk management
Engineering 5
  • STMajor Accident Hazard Management StandardIOGP 510 · 05 · EI PSM · 06 · Process Safety · Design Integrity
  • STQuantitative Risk Assessment StandardIOGP 510 · 05 · EI PSM · 06 · Process Safety · Design Integrity
  • STMajor Accident Risk Acceptance CriteriaIOGP 510 · 05 · EI PSM · 06 · Process Safety · Design Integrity
  • STBowtie StandardIOGP 510 · 05 · EI PSM · 06 · Process Safety · Design Integrity
  • PRFormal Safety Assessment ProcedureIOGP 510 · 05 · EI PSM · 06 · Process Safety · Design Integrity
HSSE 1
  • STALARP Demonstration StandardIOGP 510 · 05 · EI PSM · 06 · Process Safety · Design Integrity