Element 07 · IOGP 510

Plans and Procedures

To translate standards (Element 2) and risk controls (Element 5) into planned, executable procedures and contingency arrangements that can actually be used to do the work.

"The trap in this element is procedure inflation: thousands of pages, none used in the field. A procedure that does not name the standard it implements (Element 2) and the risk it controls (Element 5) is not a procedure — it is documentation theatre."
  • ·Engineering execution plans (Engineering Management Plan, Project Engineering Execution Plan, Basis of Design Procedure)
  • ·Department procedures (Recruitment Procedure, Tendering Procedure, Drilling Programme, Field Development Planning)
  • ·Interface and document control procedures (Engineering Interface Management, Document Control)
  • ·Discipline procedures
  • ·Contractor management procedures (Contractor Engineering Management, Contractor Mobilisation)
  • ·Contingency, emergency response, crisis and continuity plans
  • →The standards being implementedE2 Policies
  • →The risk-control logic the procedure inherits — including MoCE5 Risk
  • →The act of executing the procedureE8 Execution
IOGP 510 source content

Plans and procedures comprise clearly defined requirements to ensure risks are suitably managed and objectives can be met. Procedures describe in detail how things are to be done to ensure accuracy and consistency of approach when applying risk controls.

  • 1.Plans and procedures are established, documented and maintained in line with risk level.
  • 2.Plans and procedures (and revisions) are subject to approval at an appropriate level of authority.
  • 3.Supported by guidance and training to enable effective implementation by competent resources.
  • 4.Latest version is available at point of use.
  • 5.Contingency, emergency, crisis and continuity plans are in place with regular tests and drills.