Process Safety · Create the barriers
Design integrity
Purpose
Barriers against a major accident are identified, specified and built to be fit for purpose from the outset. Hazards are identified, risk is reduced as low as reasonably practicable, and each barrier is given a performance standard it must meet for the rest of its life. Change to plant or wells goes back through the same discipline.
The question this lens asks
“Does this document create a barrier against a major accident, keep one working, keep work inside one, or build the people who do?”
Belongs here
- Hazard identification and risk assessment (HAZID, HAZOP, formal safety assessment)
- Major accident hazard, risk acceptance and ALARP standards
- Performance standards for safety and environmental critical elements
- Engineering design standards and safety technical requirements
- Well design and planning: pore pressure, overburden, anti-collision, suspension
- Management of change for plant and wells; commissioning and handover into service
Does not belong here
- Inspection, testing and maintenance of barriers once in service (Asset integrity)
- Procedures for operating the plant (Operating integrity)
Documents by department (40)
Engineering 28
- STProcess Design BasisSiteIOGP 510 · 06 · EI PSM · 11 · COMAH Report · Establishment & Substances
- STHazardous Area Classification StandardIOGP 510 · 06 · EI PSM · 11 · COMAH Report · Measures
- STPressure Relief and Blowdown Design StandardIOGP 510 · 06 · EI PSM · 11
- STFlare System Design BasisSiteIOGP 510 · 06 · EI PSM · 11 · COMAH Report · Measures
- STSafety Instrumented Systems Lifecycle StandardIOGP 510 · 06 · EI PSM · 16
- STConsequence Modelling StandardIOGP 510 · 05 · EI PSM · 06 · COMAH Report · Scenarios & Risk
- STManagement of Change StandardIOGP 510 · 05 · EI PSM · 12
- STProject Stage Gate StandardIOGP 510 · 05 · EI PSM · 12
- STSafety Critical Element Performance StandardsSiteIOGP 510 · 06 · EI PSM · 16 · COMAH Report · Measures
- STAlarm Management PhilosophySiteIOGP 510 · 06 · EI PSM · 16
- STTank Overfill Protection StandardIOGP 510 · 06 · EI PSM · 16 · COMAH Report · Measures
- STBunding and Secondary Containment StandardIOGP 510 · 06 · EI PSM · 11 · COMAH Report · Measures
- STFire Protection PhilosophySiteIOGP 510 · 06 · EI PSM · 16 · COMAH Report · Measures
- STGas Detection PhilosophySiteIOGP 510 · 06 · EI PSM · 16 · COMAH Report · Measures
- STControl System Cyber Security StandardIOGP 510 · 06 · EI PSM · 11
- PRLayer of Protection Analysis ProcedureIOGP 510 · 05 · EI PSM · 06 · COMAH Report · Scenarios & Risk
- PRHAZOP ProcedureIOGP 510 · 05 · EI PSM · 06
- PROccupied Buildings Risk AssessmentSiteIOGP 510 · 05 · EI PSM · 06 · COMAH Report · Scenarios & Risk
- PRPlant Change ProcedureIOGP 510 · 05 · EI PSM · 12
- PRTemporary Modifications ProcedureIOGP 510 · 05 · EI PSM · 12
- PRPre-Start-up Safety Review ProcedureIOGP 510 · 07 · EI PSM · 13
- SUEngineering Design Standards RegisterIOGP 510 · 02 · EI PSM · 11
- SUHazardous Area Classification Drawings and SchedulesSiteIOGP 510 · 06 · EI PSM · 07
- SUHAZOP Study Record TemplateIOGP 510 · 05 · EI PSM · 06
- SUSafety Integrity Level Determination RecordsSiteIOGP 510 · 05 · EI PSM · 16 · COMAH Report · Scenarios & Risk
- SUSafety Requirements Specification TemplateIOGP 510 · 06 · EI PSM · 16
- SUManagement of Change Request FormIOGP 510 · 05 · EI PSM · 12
- KBLoss Prevention Engineering GuideIOGP 510 · 06 · EI PSM · 11
Operations & Maintenance 1
- PRSafety Critical Task Analysis ProcedureIOGP 510 · 05 · EI PSM · 06
HSSE 7
- STALARP Demonstration StandardIOGP 510 · 05 · EI PSM · 06 · COMAH Report · Scenarios & Risk
- STHSSE Risk Management StandardIOGP 510 · 05 · EI PSM · 06
- PRMajor Accident Hazard Identification ProcedureIOGP 510 · 05 · EI PSM · 06 · COMAH Report · Scenarios & Risk
- PRMajor Accident to the Environment Risk AssessmentSiteIOGP 510 · 05 · EI PSM · 06 · COMAH Report · Scenarios & Risk
- PRDomino Effects and Neighbouring Establishments AssessmentSiteIOGP 510 · 04 · EI PSM · 10 · COMAH Report · Scenarios & Risk
- SUDangerous Substances Inventory RegisterSiteIOGP 510 · 05 · EI PSM · 07 · COMAH Report · Establishment & Substances
- SUMajor Accident Scenario RegisterSiteIOGP 510 · 05 · EI PSM · 06 · COMAH Report · Scenarios & Risk
Pipelines & Terminals 2
- STPipeline Leak Detection StandardSiteIOGP 510 · 06 · EI PSM · 16
- STJetty and Loading Emergency Shutdown PhilosophyPlant unitIOGP 510 · 06 · EI PSM · 16 · COMAH Report · Measures
Commercial 1
- STSupplier Quality Assurance RequirementsIOGP 510 · 04 · EI PSM · 18
Business Services 1
- STOperational Technology Network Segregation StandardSiteIOGP 510 · 06 · EI PSM · 16