Process Safety · Maintain the barriers

Asset integrity

Barriers keep performing as designed for the life of the asset. They are inspected, tested, maintained and independently verified, and degradation is found and managed before it matters. When a barrier is impaired, that is known and recorded, and the risk is assessed.

“Does this document create a barrier against a major accident, keep one working, keep work inside one, or build the people who do?”

  • Integrity management of structures, pipelines, pressure systems and wells
  • Maintenance and testing strategies for safety critical equipment
  • Verification and written schemes of examination; well examination
  • Inspection results, integrity reporting and ageing and life extension
  • Barrier status, equipment criticality and critical spares
  • How the barrier was specified in the first place (Design integrity)
  • Who is competent to maintain it (People and culture)
Engineering 7
  • STPressure Systems Written Scheme of ExaminationSiteIOGP 510 · 06 · EI PSM · 15
  • STCorrosion Management StandardIOGP 510 · 06 · EI PSM · 15
  • STAgeing Plant Management StandardIOGP 510 · 06 · EI PSM · 15
  • PRRisk Based Inspection ProcedureIOGP 510 · 06 · EI PSM · 15
  • PRIgnition Control and Ex Equipment InspectionIOGP 510 · 06 · EI PSM · 16
  • PRInstrumented Protective Function Proof Test ProcedurePlant unitIOGP 510 · 08 · EI PSM · 16
  • SUSafety Critical Element RegisterSiteIOGP 510 · 06 · EI PSM · 16 · COMAH Report · Measures
Operations & Maintenance 10
  • STMaintenance Strategy StandardIOGP 510 · 06 · EI PSM · 15
  • STRotating Equipment Maintenance StrategySiteIOGP 510 · 06 · EI PSM · 15
  • STTurnaround Management StandardSiteIOGP 510 · 07 · EI PSM · 12
  • PRPlanned Maintenance ProcedureIOGP 510 · 08 · EI PSM · 15
  • PRSafety Critical Maintenance Deferral ProcedureIOGP 510 · 06 · EI PSM · 15
  • PRPressure Relief Valve Management ProcedureIOGP 510 · 06 · EI PSM · 16
  • PRFurnace Tube Integrity MonitoringPlant unitIOGP 510 · 06 · EI PSM · 15
  • PRReliability Improvement ProcessIOGP 510 · 09 · EI PSM · 15
  • SUWork Order Close-out TemplateIOGP 510 · 08 · EI PSM · 15
  • SUTurnaround Readiness ChecklistSiteIOGP 510 · 07 · EI PSM · 13
Laboratory 3
  • PROnline Analyser Maintenance and Validation ProcedurePlant unitIOGP 510 · 06 · EI PSM · 15
  • PRFeed Contaminant Monitoring ProgrammeSiteIOGP 510 · 09 · EI PSM · 15
  • PRGas Detector Calibration ProcedurePlant unitIOGP 510 · 06 · EI PSM · 16
Pipelines & Terminals 4
  • STPipeline Integrity Management SystemSiteIOGP 510 · 06 · EI PSM · 15
  • STMarine Loading Arm Maintenance StrategyPlant unitIOGP 510 · 06 · EI PSM · 15
  • PRPipeline Pigging ProcedurePlant unitIOGP 510 · 08 · EI PSM · 15
  • PRThird-party Interference and Pipeline SurveillanceSiteIOGP 510 · 06 · EI PSM · 15
Commercial 2
  • STCritical Spares and Materials StandardIOGP 510 · 06 · EI PSM · 15
  • PRPositive Material Identification ProcedureIOGP 510 · 06 · EI PSM · 15
Business Services 1
  • STMaintenance Management System Data StandardIOGP 510 · 07 · EI PSM · 15