What Engineering owns here
Element 6 is the principal home of technical integrity and consequently Engineering's deepest footprint in the management system. This is where the company commits to how assets will be designed, built, modified and maintained to remain fit-for-purpose across their full lifecycle.
Example documents, by tier
Standard 7
- Corrosion Management StrategyIn 3 of 3 operator registersCompany-wideAlso in EI PSM · 15 Inspection, maintenance and asset integrityAlso in Process Safety · Asset integrityNot safety case critical
- Vibration Management StrategyIn 1 of 3 operator registersCompany-wideAlso in EI PSM · 15 Inspection, maintenance and asset integrityAlso in Process Safety · Asset integrityNot safety case critical
- Uninterruptible Power Supply StandardIn 1 of 3 operator registersCompany-wideAlso in EI PSM · 15 Inspection, maintenance and asset integrityAlso in Process Safety · Design integrityNot safety case critical
- Industrial Automation and Control Systems Network StandardIn 2 of 3 operator registersCompany-wideAlso in EI PSM · 11 Standards and practicesAlso in Process Safety · Design integrityNot safety case critical
- Topsides Structures: Structural IntegrityIn 1 of 3 operator registersAsset · addsAlso in EI PSM · 15 Inspection, maintenance and asset integrityAlso in Process Safety · Asset integrityNot safety case critical
- Cranes and Mechanical Handling Equipment: Structural IntegrityIn 1 of 3 operator registersAsset · addsAlso in EI PSM · 15 Inspection, maintenance and asset integrityAlso in Process Safety · Asset integrityNot safety case critical
- Safety and Environmental Critical Element Ageing and Life Extension StandardIn 1 of 3 operator registersCompany-wideAlso in EI PSM · 15 Inspection, maintenance and asset integrityAlso in Process Safety · Asset integrityNot safety case critical
Process, procedure, work instruction 4
- Modification and Re-instatement of Controlled Pipeline SystemsIn 1 of 3 operator registersCompany-wideAlso in EI PSM · 12 Management of change and project managementAlso in Process Safety · Asset integrityNot safety case critical
- Pipeline Integrity Management SystemIn 2 of 3 operator registersRegion · addsAlso in EI PSM · 15 Inspection, maintenance and asset integrityAlso in Process Safety · Asset integrityNot safety case critical
- Major Accident Hazard Barrier Management ProcedureIn 1 of 3 operator registersCompany-wideAlso in EI PSM · 16 Management of safety critical devicesAlso in Process Safety · Asset integrityNot safety case critical
- Continued Suitability Assessment of Safety and Environmental Critical ElementsIn 2 of 3 operator registersCompany-wideAlso in EI PSM · 15 Inspection, maintenance and asset integrityAlso in Process Safety · Asset integrityNot safety case critical
Supporting documents 2
- Stage Gate Deliverable Requirements ChecklistTypical exampleCompany-wideAlso in EI PSM · 12 Management of change and project managementAlso in Process Safety · Design integrityNot safety case critical
- Safety and Environmental Critical Element RegisterIn 1 of 3 operator registersAsset · addsAlso in EI PSM · 16 Management of safety critical devicesAlso in Process Safety · Design integrityAlso in Safety Case · Safety and environmental critical elements
Guidance · outside the system 1
Informative, not a “shall”. These belong in the knowledge base, not the management system. How this works →
- Guide to Flushing, Greasing and Sealing of Critical ValvesIn 1 of 3 operator registersCompany-wideAlso in EI PSM · 11 Standards and practicesAlso in Process Safety · Asset integrityNot safety case critical
Why these belong here
"This is where the system holds, or doesn't. If it isn't designed for integrity, the rest of the management system is just paper around the gap."
What does not live here
- →The standards being implemented —E02 Policies
- →The risk-acceptance behind a design decision —E05 Risk
- →The execution plans by which engineering work is delivered —E07 Procedures
- →The audits and verification that integrity has been achieved over time —E10 Assurance