Element 05×Engineering

Engineering in Risk

Risk Assessment and Control

This is where Engineering does its most consequential work: identifying, assessing, controlling, accepting and changing technical risk. MoC sits in Element 5 (the IOGP 510 base position) — which keeps technical change anchored to risk control, not documentation.

Standard 6

  • Management of Change StandardIn 2 of 3 operator registersCompany-wideAlso in EI PSM · 12 Management of change and project managementAlso in Process Safety · Design integrityNot safety case critical
  • Certified Electrical Equipment: Ignition ControlIn 1 of 3 operator registersAsset · addsAlso in EI PSM · 16 Management of safety critical devicesAlso in Process Safety · Design integrityNot safety case critical
  • Major Accident Hazard Management StandardIn 3 of 3 operator registersCompany-wideAlso in EI PSM · 06 Hazard identification and risk assessmentAlso in Process Safety · Design integrityAlso in Safety Case · Major accident hazards and risk
  • Quantitative Risk Assessment StandardIn 1 of 3 operator registersCompany-wideAlso in EI PSM · 06 Hazard identification and risk assessmentAlso in Process Safety · Design integrityAlso in Safety Case · Major accident hazards and risk
  • Major Accident Risk Acceptance CriteriaIn 1 of 3 operator registersCompany-wideAlso in EI PSM · 06 Hazard identification and risk assessmentAlso in Process Safety · Design integrityAlso in Safety Case · Major accident hazards and risk
  • Bowtie StandardIn 1 of 3 operator registersCompany-wideAlso in EI PSM · 06 Hazard identification and risk assessmentAlso in Process Safety · Design integrityAlso in Safety Case · Major accident hazards and risk

Process, procedure, work instruction 7

  • Change Management ProcedureIn 2 of 3 operator registersCompany-wideAlso in EI PSM · 12 Management of change and project managementAlso in Process Safety · Design integrityNot safety case critical
  • Hazard Identification and Risk Assessment ProcedureIn 1 of 3 operator registersCompany-wideAlso in EI PSM · 06 Hazard identification and risk assessmentAlso in Process Safety · Design integrityNot safety case critical
  • Operational Risk Assessment ProcedureIn 3 of 3 operator registersCompany-wideAlso in EI PSM · 06 Hazard identification and risk assessmentAlso in Process Safety · Operating integrityNot safety case critical
  • Dynamic Positioning Systems Risk Assessment ProcedureTypical exampleCompany-wideAlso in EI PSM · 06 Hazard identification and risk assessmentAlso in Process Safety · Operating integrityNot safety case critical
  • HAZID ProcedureIn 1 of 3 operator registersCompany-wideAlso in EI PSM · 06 Hazard identification and risk assessmentAlso in Process Safety · Design integrityNot safety case critical
  • Fire and Gas Detection PhilosophyTypical exampleRegion · addsAlso in EI PSM · 16 Management of safety critical devicesAlso in Process Safety · Design integrityAlso in Safety Case · Safety and environmental critical elements
  • Formal Safety Assessment ProcedureIn 2 of 3 operator registersCompany-wideAlso in EI PSM · 06 Hazard identification and risk assessmentAlso in Process Safety · Design integrityAlso in Safety Case · Major accident hazards and risk

Supporting documents 1

  • HAZOP Report TemplateIn 1 of 3 operator registersCompany-wideAlso in EI PSM · 06 Hazard identification and risk assessmentAlso in Process Safety · Design integrityNot safety case critical

Guidance · outside the system 1

Informative, not a “shall”. These belong in the knowledge base, not the management system. How this works →

  • Alarm System GuidelineIn 1 of 3 operator registersCompany-wideAlso in EI PSM · 16 Management of safety critical devicesAlso in Process Safety · Design integrityNot safety case critical
"This is where Engineering becomes a risk control function, not a drawing factory. If MoC is treated as paperwork, the company has no real control over its own technical risk."
  • →The standards used to set acceptance thresholds — those areE02 Policies
  • →The design that implements the risk-controlled decision — that goes inE06 Integrity
  • →The procedures that execute the risk control in the field — those areE07 Procedures
  • →The verification that the risk control is working — that'sE10 Assurance