Element 05×Subsurface

Subsurface in Risk

Risk Assessment and Control

This element holds the management of uncertainty — scenario planning, sensitivity analysis, decision-gate risk assessment and the reservoir risk register.

Process, procedure, work instruction 3

  • Well Interventions Delivery ProcessIn 2 of 3 operator registersCompany-wideAlso in EI PSM · 08 Operating manuals and proceduresAlso in Process Safety · Operating integrityNot safety case critical
  • Subsurface Uncertainty and Risk AssessmentTypical exampleCompany-wideAlso in EI PSM · 06 Hazard identification and risk assessmentNot process safetyNot safety case critical
  • Overburden Risk AssessmentIn 1 of 3 operator registersAsset · addsAlso in EI PSM · 06 Hazard identification and risk assessmentAlso in Process Safety · Design integrityNot safety case critical

Guidance · outside the system 2

Informative, not a “shall”. These belong in the knowledge base, not the management system. How this works →

  • Overburden Management GuidelineTypical exampleCompany-wideAlso in EI PSM · 06 Hazard identification and risk assessmentAlso in Process Safety · Design integrityNot safety case critical
  • Water Management GuidelineIn 1 of 3 operator registersCompany-wideAlso in EI PSM · 11 Standards and practicesNot process safetyNot safety case critical
"This is about managing uncertainty, not eliminating it."
  • →The standards setting acceptance thresholds — (Policies and Standards)E02 Policies
  • →The execution of a study — (Plans and Procedures)E07 Procedures
  • →The independent peer review of the analysis — (Assurance, Review and Improvement)E10 Assurance