Process Safety×Subsurface

Subsurface in Design Integrity

Create the barriers

Barriers against a major accident are identified, specified and built to be fit for purpose from the outset. Hazards are identified, risk is reduced as low as reasonably practicable, and each barrier is given a performance standard it must meet for the rest of its life. Change to plant or wells goes back through the same discipline.

Standard 1

  • Pore Pressure, Stresses and Shear Failure in Well PlanningTypical exampleCompany-wideAlso in IOGP 510 · 06 Asset Design and IntegrityAlso in EI PSM · 06 Hazard identification and risk assessmentNot safety case critical

Process, procedure, work instruction 1

  • Overburden Risk AssessmentIn 1 of 3 operator registersAsset · addsAlso in IOGP 510 · 05 Risk Assessment and ControlAlso in EI PSM · 06 Hazard identification and risk assessmentNot safety case critical

Guidance · outside the system 1

Informative, not a “shall”. These belong in the knowledge base, not the management system. How this works →

  • Overburden Management GuidelineTypical exampleCompany-wideAlso in IOGP 510 · 05 Risk Assessment and ControlAlso in EI PSM · 06 Hazard identification and risk assessmentNot safety case critical