Process Safety · Create the barriers
Design integrity
Purpose
Barriers against a major accident are identified, specified and built to be fit for purpose from the outset. Hazards are identified, risk is reduced as low as reasonably practicable, and each barrier is given a performance standard it must meet for the rest of its life. Change to plant or wells goes back through the same discipline.
The question this lens asks
“Does this document create a barrier against a major accident, keep one working, keep work inside one, or build the people who do?”
Belongs here
- Hazard identification and risk assessment (HAZID, HAZOP, formal safety assessment)
- Major accident hazard, risk acceptance and ALARP standards
- Performance standards for safety and environmental critical elements
- Engineering design standards and safety technical requirements
- Well design and planning: pore pressure, overburden, anti-collision, suspension
- Management of change for plant and wells; commissioning and handover into service
Does not belong here
- Inspection, testing and maintenance of barriers once in service (Asset integrity)
- Procedures for operating the plant (Operating integrity)
Documents by department (63)
Engineering 37
- PORotating Equipment Overspeed Protection PolicyIOGP 510 · 02 · EI PSM · 16
- STPerformance Standard: SECE PipelinesIOGP 510 · 02 · EI PSM · 16 · Safety Case · SECEs
- STPerformance Standard: SECE Fire and Gas DetectionIOGP 510 · 02 · EI PSM · 16 · Safety Case · SECEs
- STPerformance Standard: SECE Process ContainmentIOGP 510 · 02 · EI PSM · 16 · Safety Case · SECEs
- STPerformance Standard: SECE Temporary RefugeIOGP 510 · 02 · EI PSM · 16 · Safety Case · SECEs
- STPerformance Standard: Jacket StructuresIOGP 510 · 02 · EI PSM · 16 · Safety Case · SECEs
- STInstallation Performance Standard: Passive Fire ProtectionAssetIOGP 510 · 02 · EI PSM · 16 · Safety Case · SECEs
- STSupplier Technical Assurance RequirementsIOGP 510 · 04 · EI PSM · 18
- STManagement of Change StandardIOGP 510 · 05 · EI PSM · 12
- STCertified Electrical Equipment: Ignition ControlAssetIOGP 510 · 05 · EI PSM · 16
- STUninterruptible Power Supply StandardIOGP 510 · 06 · EI PSM · 15
- STIndustrial Automation and Control Systems Network StandardIOGP 510 · 06 · EI PSM · 11
- STPlanning and Executing Decommissioning ProjectsIOGP 510 · 07 · EI PSM · 12
- STMajor Accident Hazard Management StandardIOGP 510 · 05 · EI PSM · 06 · Safety Case · MAH & Risk
- STQuantitative Risk Assessment StandardIOGP 510 · 05 · EI PSM · 06 · Safety Case · MAH & Risk
- STMajor Accident Risk Acceptance CriteriaIOGP 510 · 05 · EI PSM · 06 · Safety Case · MAH & Risk
- STBowtie StandardIOGP 510 · 05 · EI PSM · 06 · Safety Case · MAH & Risk
- STPerformance Standard: SECE Escape, Evacuation and MusterIOGP 510 · 02 · EI PSM · 16 · Safety Case · SECEs
- PRChange Management ProcedureIOGP 510 · 05 · EI PSM · 12
- PRHazard Identification and Risk Assessment ProcedureIOGP 510 · 05 · EI PSM · 06
- PRHAZID ProcedureIOGP 510 · 05 · EI PSM · 06
- PRFire and Gas Detection PhilosophyRegionIOGP 510 · 05 · EI PSM · 16 · Safety Case · SECEs
- PRWeight Control ProcedureIOGP 510 · 07 · EI PSM · 12
- PRCommissioning and Handover ProcedureIOGP 510 · 08 · EI PSM · 13
- PRInspection Assessment of Projects and ModificationsIOGP 510 · 10 · EI PSM · 20
- PRFormal Safety Assessment ProcedureIOGP 510 · 05 · EI PSM · 06 · Safety Case · MAH & Risk
- SUHAZOP Report TemplateIOGP 510 · 05 · EI PSM · 06
- SUStage Gate Deliverable Requirements ChecklistIOGP 510 · 06 · EI PSM · 12
- SUHAZID Report TemplateIOGP 510 · 09 · EI PSM · 06
- SUPlant Management of Change Impact Analysis TemplateAssetIOGP 510 · 09 · EI PSM · 12
- SUFunctional Safety Impact Assessment ChecklistIOGP 510 · 10 · EI PSM · 16
- SUSafety and Environmental Critical Element RegisterAssetIOGP 510 · 06 · EI PSM · 16 · Safety Case · SECEs
- KBStandards and Requirements Selection GuideIOGP 510 · 02 · EI PSM · 11
- KBProject HSSE HandbookIOGP 510 · 03 · EI PSM · 03
- KBAlarm System GuidelineIOGP 510 · 05 · EI PSM · 16
- KBConstruction and Commissioning Strategy DevelopmentIOGP 510 · 07 · EI PSM · 13
- KBRequirement Assurance, Verification and Validation GuideIOGP 510 · 10 · EI PSM · 20
Operations & Maintenance 4
- STWell Containment, Process Containment and Shutdown SystemsAssetIOGP 510 · 05 · EI PSM · 16 · Safety Case · SECEs
- STPerformance Standard: Ship and Aircraft Collision BarriersAssetIOGP 510 · 02 · EI PSM · 16 · Safety Case · SECEs
- STTemporary Refuge Boundary DefinitionAssetIOGP 510 · 06 · EI PSM · 14 · Safety Case · Emergency & EER
- SUDecommissioning Risk RegisterIOGP 510 · 05 · EI PSM · 06
HSSE 8
- STHSSE Risk Management StandardIOGP 510 · 02 · EI PSM · 06
- STPerformance Standard: Deluge Protection SystemsAssetIOGP 510 · 02 · EI PSM · 16 · Safety Case · SECEs
- STPerformance Standard: Gaseous Fire Protection SystemAssetIOGP 510 · 02 · EI PSM · 16 · Safety Case · SECEs
- STSafety Technical RequirementsIOGP 510 · 06 · EI PSM · 11
- STALARP Demonstration StandardIOGP 510 · 05 · EI PSM · 06 · Safety Case · MAH & Risk
- STEscape, Evacuation and Rescue AssessmentAssetIOGP 510 · 07 · EI PSM · 14 · Safety Case · Emergency & EER
- PRSafety Case Management of Change ProcedureIOGP 510 · 05 · EI PSM · 12
- KBHuman Factors Engineering Assessment ToolsIOGP 510 · 06 · EI PSM · 06
Subsurface 3
- STPore Pressure, Stresses and Shear Failure in Well PlanningIOGP 510 · 06 · EI PSM · 06
- PROverburden Risk AssessmentAssetIOGP 510 · 05 · EI PSM · 06
- KBOverburden Management GuidelineIOGP 510 · 05 · EI PSM · 06
Wells 11
- POWell Suspension PolicyIOGP 510 · 02 · EI PSM · 11
- STPerformance Standard: SECE Operational Well ContainmentIOGP 510 · 02 · EI PSM · 16 · Safety Case · SECEs
- STInstallation Performance Standard: WellsAssetIOGP 510 · 02 · EI PSM · 16 · Safety Case · SECEs
- STDrilling and Well Control Equipment StandardIOGP 510 · 06 · EI PSM · 16
- PRDrilling and Completions Management of Change ProcessIOGP 510 · 05 · EI PSM · 12
- PRChallenging Wells Risk TreatmentAssetIOGP 510 · 05 · EI PSM · 06
- PRDefinitive Survey Management ProcedureIOGP 510 · 07 · EI PSM · 08
- PROffset Well Review ProcessIOGP 510 · 09 · EI PSM · 19
- SUWell Standards Deviation FormIOGP 510 · 02 · EI PSM · 12
- SUWell Planning Package TemplateIOGP 510 · 07 · EI PSM · 08
- SUWell Change Request TemplateIOGP 510 · 08 · EI PSM · 12