Process Safety×Engineering

Engineering in Asset Integrity

Maintain the barriers

Barriers keep performing as designed for the life of the asset. They are inspected, tested, maintained and independently verified, and degradation is found and managed before it matters. When a barrier is impaired, that is known and recorded, and the risk is assessed.

Standard 11

  • Operational Performance Standards and Verification Examination SchemeIn 1 of 3 operator registersRegion · addsAlso in IOGP 510 · 02 Policies and StandardsAlso in EI PSM · 16 Management of safety critical devicesAlso in Safety Case · Verification and examination
  • Corrosion Management StrategyIn 3 of 3 operator registersCompany-wideAlso in IOGP 510 · 06 Asset Design and IntegrityAlso in EI PSM · 15 Inspection, maintenance and asset integrityNot safety case critical
  • Vibration Management StrategyIn 1 of 3 operator registersCompany-wideAlso in IOGP 510 · 06 Asset Design and IntegrityAlso in EI PSM · 15 Inspection, maintenance and asset integrityNot safety case critical
  • Topsides Structures: Structural IntegrityIn 1 of 3 operator registersAsset · addsAlso in IOGP 510 · 06 Asset Design and IntegrityAlso in EI PSM · 15 Inspection, maintenance and asset integrityNot safety case critical
  • Cranes and Mechanical Handling Equipment: Structural IntegrityIn 1 of 3 operator registersAsset · addsAlso in IOGP 510 · 06 Asset Design and IntegrityAlso in EI PSM · 15 Inspection, maintenance and asset integrityNot safety case critical
  • Bolt Torquing and Tensioning StandardIn 1 of 3 operator registersCompany-wideAlso in IOGP 510 · 08 Execution of ActivitiesAlso in EI PSM · 15 Inspection, maintenance and asset integrityNot safety case critical
  • Written Scheme of Examination: Access and Egress RoutesIn 1 of 3 operator registersAsset · addsAlso in IOGP 510 · 08 Execution of ActivitiesAlso in EI PSM · 16 Management of safety critical devicesNot safety case critical
  • Written Scheme of Examination: Temporary EquipmentIn 1 of 3 operator registersAsset · addsAlso in IOGP 510 · 08 Execution of ActivitiesAlso in EI PSM · 16 Management of safety critical devicesNot safety case critical
  • Verification and Examination SchemeIn 1 of 3 operator registersCompany-wideAlso in IOGP 510 · 10 Assurance, Review and ImprovementAlso in EI PSM · 20 Audit, assurance, management review and interventionAlso in Safety Case · Verification and examination
  • Performance Standard Annual Assurance ReportIn 1 of 3 operator registersAsset · addsAlso in IOGP 510 · 10 Assurance, Review and ImprovementAlso in EI PSM · 20 Audit, assurance, management review and interventionNot safety case critical
  • Safety and Environmental Critical Element Ageing and Life Extension StandardIn 1 of 3 operator registersCompany-wideAlso in IOGP 510 · 06 Asset Design and IntegrityAlso in EI PSM · 15 Inspection, maintenance and asset integrityNot safety case critical

Process, procedure, work instruction 11

  • Subsea Management System ManualIn 1 of 3 operator registersCompany-wideAlso in IOGP 510 · 01 Commitment and AccountabilityAlso in EI PSM · 01 Leadership, commitment and responsibilityNot safety case critical
  • Modification and Re-instatement of Controlled Pipeline SystemsIn 1 of 3 operator registersCompany-wideAlso in IOGP 510 · 06 Asset Design and IntegrityAlso in EI PSM · 12 Management of change and project managementNot safety case critical
  • Pipeline Integrity Management SystemIn 2 of 3 operator registersRegion · addsAlso in IOGP 510 · 06 Asset Design and IntegrityAlso in EI PSM · 15 Inspection, maintenance and asset integrityNot safety case critical
  • Import Riser ESDV Leak Test ProcedureIn 1 of 3 operator registersRegion · addsAlso in IOGP 510 · 07 Plans and ProceduresAlso in EI PSM · 16 Management of safety critical devicesNot safety case critical
  • Valve Replacement ProcessIn 1 of 3 operator registersCompany-wideAlso in IOGP 510 · 08 Execution of ActivitiesAlso in EI PSM · 15 Inspection, maintenance and asset integrityNot safety case critical
  • Pressure Containing Equipment Work InstructionTypical exampleCompany-wideAlso in IOGP 510 · 08 Execution of ActivitiesAlso in EI PSM · 15 Inspection, maintenance and asset integrityNot safety case critical
  • Analysis of Inspection ResultsIn 1 of 3 operator registersCompany-wideAlso in IOGP 510 · 09 Monitoring, Reporting and LearningAlso in EI PSM · 15 Inspection, maintenance and asset integrityNot safety case critical
  • Inspection Annual ReportIn 1 of 3 operator registersCompany-wideAlso in IOGP 510 · 09 Monitoring, Reporting and LearningAlso in EI PSM · 15 Inspection, maintenance and asset integrityNot safety case critical
  • Certificate of Inspection Compliance for Pressure SystemsIn 1 of 3 operator registersCompany-wideAlso in IOGP 510 · 10 Assurance, Review and ImprovementAlso in EI PSM · 20 Audit, assurance, management review and interventionNot safety case critical
  • Major Accident Hazard Barrier Management ProcedureIn 1 of 3 operator registersCompany-wideAlso in IOGP 510 · 06 Asset Design and IntegrityAlso in EI PSM · 16 Management of safety critical devicesNot safety case critical
  • Continued Suitability Assessment of Safety and Environmental Critical ElementsIn 2 of 3 operator registersCompany-wideAlso in IOGP 510 · 06 Asset Design and IntegrityAlso in EI PSM · 15 Inspection, maintenance and asset integrityNot safety case critical

Guidance · outside the system 2

Informative, not a “shall”. These belong in the knowledge base, not the management system. How this works →

  • Guide to Flushing, Greasing and Sealing of Critical ValvesIn 1 of 3 operator registersCompany-wideAlso in IOGP 510 · 06 Asset Design and IntegrityAlso in EI PSM · 11 Standards and practicesNot safety case critical
  • Small Bore Tubing Installation GuidanceIn 1 of 3 operator registersCompany-wideAlso in IOGP 510 · 08 Execution of ActivitiesAlso in EI PSM · 15 Inspection, maintenance and asset integrityNot safety case critical