Process Safety · Maintain the barriers

Asset integrity

Barriers keep performing as designed for the life of the asset. They are inspected, tested, maintained and independently verified, and degradation is found and managed before it matters. When a barrier is impaired, that is known and recorded, and the risk is assessed.

“Does this document create a barrier against a major accident, keep one working, keep work inside one, or build the people who do?”

  • Integrity management of structures, pipelines, pressure systems and wells
  • Maintenance and testing strategies for safety critical equipment
  • Verification and written schemes of examination; well examination
  • Inspection results, integrity reporting and ageing and life extension
  • Barrier status, equipment criticality and critical spares
  • How the barrier was specified in the first place (Design integrity)
  • Who is competent to maintain it (People and culture)
Engineering 24
  • STOperational Performance Standards and Verification Examination SchemeRegionIOGP 510 · 02 · EI PSM · 16 · Safety Case · Verification
  • STCorrosion Management StrategyIOGP 510 · 06 · EI PSM · 15
  • STVibration Management StrategyIOGP 510 · 06 · EI PSM · 15
  • STTopsides Structures: Structural IntegrityAssetIOGP 510 · 06 · EI PSM · 15
  • STCranes and Mechanical Handling Equipment: Structural IntegrityAssetIOGP 510 · 06 · EI PSM · 15
  • STBolt Torquing and Tensioning StandardIOGP 510 · 08 · EI PSM · 15
  • STWritten Scheme of Examination: Access and Egress RoutesAssetIOGP 510 · 08 · EI PSM · 16
  • STWritten Scheme of Examination: Temporary EquipmentAssetIOGP 510 · 08 · EI PSM · 16
  • STVerification and Examination SchemeIOGP 510 · 10 · EI PSM · 20 · Safety Case · Verification
  • STPerformance Standard Annual Assurance ReportAssetIOGP 510 · 10 · EI PSM · 20
  • STSafety and Environmental Critical Element Ageing and Life Extension StandardIOGP 510 · 06 · EI PSM · 15
  • PRSubsea Management System ManualIOGP 510 · 01 · EI PSM · 01
  • PRModification and Re-instatement of Controlled Pipeline SystemsIOGP 510 · 06 · EI PSM · 12
  • PRPipeline Integrity Management SystemRegionIOGP 510 · 06 · EI PSM · 15
  • PRImport Riser ESDV Leak Test ProcedureRegionIOGP 510 · 07 · EI PSM · 16
  • PRValve Replacement ProcessIOGP 510 · 08 · EI PSM · 15
  • PRPressure Containing Equipment Work InstructionIOGP 510 · 08 · EI PSM · 15
  • PRAnalysis of Inspection ResultsIOGP 510 · 09 · EI PSM · 15
  • PRInspection Annual ReportIOGP 510 · 09 · EI PSM · 15
  • PRCertificate of Inspection Compliance for Pressure SystemsIOGP 510 · 10 · EI PSM · 20
  • PRMajor Accident Hazard Barrier Management ProcedureIOGP 510 · 06 · EI PSM · 16
  • PRContinued Suitability Assessment of Safety and Environmental Critical ElementsIOGP 510 · 06 · EI PSM · 15
  • KBGuide to Flushing, Greasing and Sealing of Critical ValvesIOGP 510 · 06 · EI PSM · 11
  • KBSmall Bore Tubing Installation GuidanceIOGP 510 · 08 · EI PSM · 15
Operations & Maintenance 17
  • STEquipment Criticality StandardIOGP 510 · 02 · EI PSM · 15
  • STSand Risk Management StandardIOGP 510 · 02 · EI PSM · 06
  • STOperating Standard: Management of Problem ValvesIOGP 510 · 02 · EI PSM · 15
  • STProduction Chemistry StandardRegionIOGP 510 · 02 · EI PSM · 11
  • STInstrumentation and Fire and Gas Detection Maintenance StrategyIOGP 510 · 06 · EI PSM · 16
  • STActive Fire Protection Equipment StrategyIOGP 510 · 06 · EI PSM · 16
  • STRiser ESDV Maintenance StrategyAssetIOGP 510 · 06 · EI PSM · 16
  • STDeluge Wet Testing StrategyIOGP 510 · 08 · EI PSM · 16
  • PRStructural Integrity Reporting ProcessIOGP 510 · 06 · EI PSM · 15
  • PRPressure Systems Risk Based Inspection ProcedureIOGP 510 · 06 · EI PSM · 15
  • PRPressure Transmitter Change-out Work InstructionIOGP 510 · 08 · EI PSM · 15
  • PRCorrosion Control SchemeRegionIOGP 510 · 08 · EI PSM · 15
  • PRPressure System Reporting ProcessIOGP 510 · 09 · EI PSM · 09
  • PRVerification Scheme ImplementationIOGP 510 · 10 · EI PSM · 20
  • SUWork Order Close-out RecordRegionIOGP 510 · 04 · EI PSM · 15
  • KBBarrier Management GuidanceIOGP 510 · 05 · EI PSM · 16
  • KBCorrosion under Insulation Prioritisation GuidelineIOGP 510 · 06 · EI PSM · 15
Commercial 1
  • STCritical Supplier Identification StandardIOGP 510 · 05 · EI PSM · 18
Subsurface 1
  • STWell and Formation Integrity Aspects of InjectionIOGP 510 · 06 · EI PSM · 15
Wells 11
  • STWell Integrity Management System StandardIOGP 510 · 02 · EI PSM · 15
  • STWell Integrity Manual: Offshore OperationsAssetIOGP 510 · 06 · EI PSM · 15
  • STWell Examination SchemeIOGP 510 · 10 · EI PSM · 20 · Safety Case · Verification
  • PRWell Integrity Risk Level Evaluation ProcessIOGP 510 · 05 · EI PSM · 06
  • PRWell Integrity Monitoring and Maintenance ProcessIOGP 510 · 06 · EI PSM · 15
  • PRSubsea Well Integrity Testing ProcedureRegionIOGP 510 · 06 · EI PSM · 15
  • PRAnnulus Pressure ManagementAssetIOGP 510 · 08 · EI PSM · 15
  • SUWell Integrity Dispensation FormIOGP 510 · 06 · EI PSM · 12
  • SUWell Examination Scheme Examination SheetsIOGP 510 · 08 · EI PSM · 20
  • KBWell Examination Scheme GuidanceIOGP 510 · 05 · EI PSM · 20
  • KBWell Integrity Failure ModelIOGP 510 · 06 · EI PSM · 15