Process Safety · Work within the barriers

Operating integrity

Plant is operated inside its safe operating envelope, and work is controlled so that barriers are not bypassed, defeated or overloaded. When a barrier is overridden, the override is authorised and controlled. When prevention fails, emergency response mitigates the consequences.

“Does this document create a barrier against a major accident, keep one working, keep work inside one, or build the people who do?”

  • Operating philosophy, manuals and operating procedures
  • Control of work, permit to work and isolations
  • Override of safeguarding systems; operational risk assessment
  • Contractor, marine and aviation operations at the worksite
  • Emergency response, pollution response and incident reporting
  • Maintenance of the barriers themselves (Asset integrity)
  • Occupational safety that does not bear on a major accident (outside this lens)
Engineering 7
  • PRCode of Practice: Electrical Safety ProceduresIOGP 510 · 02 · EI PSM · 17
  • PROperational Risk Assessment ProcedureIOGP 510 · 05 · EI PSM · 06
  • PRDynamic Positioning Systems Risk Assessment ProcedureIOGP 510 · 05 · EI PSM · 06
  • PRInstallation Marine Operations ProcedureIOGP 510 · 07 · EI PSM · 08
  • PRChemicals Management ProcedureIOGP 510 · 07 · EI PSM · 08
  • PRPipelines Emergency Procedures ManualIOGP 510 · 07 · EI PSM · 14
  • SUZone Management ChecklistIOGP 510 · 08 · EI PSM · 17
Operations & Maintenance 33
  • POOperating PhilosophyIOGP 510 · 01 · EI PSM · 01 · Safety Case · Policy & Operating Basis
  • POLifting and Hoisting PolicyIOGP 510 · 02 · EI PSM · 17
  • POStatement of Fitness at Asset RestartIOGP 510 · 07 · EI PSM · 13
  • STOperating Standard: Permit to WorkIOGP 510 · 02 · EI PSM · 17
  • STOperating Standard: Control of WorkIOGP 510 · 02 · EI PSM · 17
  • STOperating Standard: Flare and Vent SystemsAssetIOGP 510 · 02 · EI PSM · 08
  • STOperating Standard: Chemical InjectionAssetIOGP 510 · 02 · EI PSM · 08
  • PRThird-Party Access and Tie-in Interface ProcedureIOGP 510 · 04 · EI PSM · 10
  • PRManagement of Change Control MatrixIOGP 510 · 05 · EI PSM · 12
  • PROverriding of Safeguarding Systems and AlarmsIOGP 510 · 05 · EI PSM · 17
  • PRRisk Assessment Work InstructionIOGP 510 · 05 · EI PSM · 17
  • PRControl System Cyber Security: Remote Access ProcessIOGP 510 · 05 · EI PSM · 08
  • PRLoss of Primary Containment NotificationIOGP 510 · 05 · EI PSM · 19
  • PROperating Manual: Life Saving EquipmentRegionIOGP 510 · 05 · EI PSM · 14
  • PROperating Procedure: Seawater SystemIOGP 510 · 07 · EI PSM · 08
  • PROperating Procedure: Open and Closed DrainsIOGP 510 · 07 · EI PSM · 08
  • PROperating Procedure: Inert Gas SystemsIOGP 510 · 07 · EI PSM · 08
  • PROperating Procedure: Diesel Oil SystemsIOGP 510 · 07 · EI PSM · 08
  • PROperating Procedure: Heating Medium SystemIOGP 510 · 07 · EI PSM · 08
  • PROperating Manual: Power Generation and DistributionRegionIOGP 510 · 07 · EI PSM · 08
  • PROperating Procedure: Water Injection SystemAssetIOGP 510 · 07 · EI PSM · 08
  • PRRe-instatement and Recommissioning of Plant and EquipmentIOGP 510 · 08 · EI PSM · 13
  • PRHazardous Leak ReportingIOGP 510 · 09 · EI PSM · 19
  • PRInstallation Emergency Response PlanAssetIOGP 510 · 07 · EI PSM · 14 · Safety Case · Emergency & EER
  • PROperational Risk Assessment for Impaired Safety and Environmental Critical ElementsIOGP 510 · 05 · EI PSM · 16
  • SULift Plan and Hazard Identification FormIOGP 510 · 07 · EI PSM · 17
  • SUTemporary Equipment Pre-mobilisation ChecklistIOGP 510 · 08 · EI PSM · 13
  • SUStation BillAssetIOGP 510 · 08 · EI PSM · 14
  • SUOperational Readiness Review Report TemplateIOGP 510 · 09 · EI PSM · 13
  • SUArea Log SheetsAssetIOGP 510 · 09 · EI PSM · 09
  • KBMechanical Isolation GuidanceIOGP 510 · 02 · EI PSM · 17
  • KBFlare Management PlanIOGP 510 · 07 · EI PSM · 08
  • KBArc Flash Hazard Management GuidelineIOGP 510 · 08 · EI PSM · 17
HSSE 13
  • POLife Saving RulesIOGP 510 · 01 · EI PSM · 01
  • PRContractor HSSE ManagementIOGP 510 · 01 · EI PSM · 18
  • PROffshore Oil Pollution Emergency PlanIOGP 510 · 07 · EI PSM · 14
  • PROnshore Terminal Emergency Response PlanIOGP 510 · 07 · EI PSM · 14
  • PRSevere Weather Action PlanIOGP 510 · 07 · EI PSM · 14
  • PRIncident Management PlanIOGP 510 · 07 · EI PSM · 14
  • PRStatutory Reporting of Incidents and Regulatory Non-CompliancesIOGP 510 · 09 · EI PSM · 19
  • SUContractor Management Activity AssessmentIOGP 510 · 04 · EI PSM · 18
  • SUEvacuation Reception Centre ChecklistsIOGP 510 · 06 · EI PSM · 14
  • SUEvent Investigation Report TemplateIOGP 510 · 09 · EI PSM · 19
  • SUCombined Operations Interface Document TemplateIOGP 510 · 04 · EI PSM · 10
  • KBContractor Management GuidelinesIOGP 510 · 04 · EI PSM · 18
  • KBEmergency Response GuidanceIOGP 510 · 07 · EI PSM · 14
Commercial 9
  • POContractor Management PhilosophyIOGP 510 · 01 · EI PSM · 18
  • STMarine Operations and Vessel Assurance StandardIOGP 510 · 02 · EI PSM · 18
  • STAnchor Handling and Tow Vessel StandardIOGP 510 · 02 · EI PSM · 18
  • PRLogistics HSE CaseIOGP 510 · 05 · EI PSM · 18
  • PRContractor HSE Risk Assessment ProcessIOGP 510 · 05 · EI PSM · 18
  • PRAviation ProcedureIOGP 510 · 07 · EI PSM · 18
  • PRHelicopter Operations ProcedureAssetIOGP 510 · 07 · EI PSM · 18
  • PRVessel Collision ProcedureAssetIOGP 510 · 07 · EI PSM · 14
  • KBOffshore Marine Operations GuidelinesIOGP 510 · 08 · EI PSM · 18
Subsurface 3
  • STSleeve Movement StandardAssetIOGP 510 · 02 · EI PSM · 08
  • PRWell Interventions Delivery ProcessIOGP 510 · 05 · EI PSM · 08
  • PRWell Testing ProcedureAssetIOGP 510 · 08 · EI PSM · 08
Wells 8
  • STWell Control StandardsIOGP 510 · 02 · EI PSM · 11
  • STWell Intervention Delivery StandardIOGP 510 · 02 · EI PSM · 11
  • PRContractor Management for Drilling and Well ActivitiesIOGP 510 · 04 · EI PSM · 18
  • PRPressure Control Manual for Drilling, Completions and InterventionIOGP 510 · 05 · EI PSM · 08
  • PROperational Readiness Review ProcedureIOGP 510 · 07 · EI PSM · 13
  • PRH2S ProcedureIOGP 510 · 07 · EI PSM · 08
  • PRWell Acceptance and Handover ProcedureAssetIOGP 510 · 07 · EI PSM · 13
  • KBWell Control GuidelinesIOGP 510 · 08 · EI PSM · 11