Process Safety · Work within the barriers
Operating integrity
Purpose
Plant is operated inside its safe operating envelope, and work is controlled so that barriers are not bypassed, defeated or overloaded. When a barrier is overridden, the override is authorised and controlled. When prevention fails, emergency response mitigates the consequences.
The question this lens asks
“Does this document create a barrier against a major accident, keep one working, keep work inside one, or build the people who do?”
Belongs here
- Operating philosophy, manuals and operating procedures
- Control of work, permit to work and isolations
- Override of safeguarding systems; operational risk assessment
- Contractor, marine and aviation operations at the worksite
- Emergency response, pollution response and incident reporting
Does not belong here
- Maintenance of the barriers themselves (Asset integrity)
- Occupational safety that does not bear on a major accident (outside this lens)
Documents by department (73)
Engineering 7
- PRCode of Practice: Electrical Safety ProceduresIOGP 510 · 02 · EI PSM · 17
- PROperational Risk Assessment ProcedureIOGP 510 · 05 · EI PSM · 06
- PRDynamic Positioning Systems Risk Assessment ProcedureIOGP 510 · 05 · EI PSM · 06
- PRInstallation Marine Operations ProcedureIOGP 510 · 07 · EI PSM · 08
- PRChemicals Management ProcedureIOGP 510 · 07 · EI PSM · 08
- PRPipelines Emergency Procedures ManualIOGP 510 · 07 · EI PSM · 14
- SUZone Management ChecklistIOGP 510 · 08 · EI PSM · 17
Operations & Maintenance 33
- POOperating PhilosophyIOGP 510 · 01 · EI PSM · 01 · Safety Case · Policy & Operating Basis
- POLifting and Hoisting PolicyIOGP 510 · 02 · EI PSM · 17
- POStatement of Fitness at Asset RestartIOGP 510 · 07 · EI PSM · 13
- STOperating Standard: Permit to WorkIOGP 510 · 02 · EI PSM · 17
- STOperating Standard: Control of WorkIOGP 510 · 02 · EI PSM · 17
- STOperating Standard: Flare and Vent SystemsAssetIOGP 510 · 02 · EI PSM · 08
- STOperating Standard: Chemical InjectionAssetIOGP 510 · 02 · EI PSM · 08
- PRThird-Party Access and Tie-in Interface ProcedureIOGP 510 · 04 · EI PSM · 10
- PRManagement of Change Control MatrixIOGP 510 · 05 · EI PSM · 12
- PROverriding of Safeguarding Systems and AlarmsIOGP 510 · 05 · EI PSM · 17
- PRRisk Assessment Work InstructionIOGP 510 · 05 · EI PSM · 17
- PRControl System Cyber Security: Remote Access ProcessIOGP 510 · 05 · EI PSM · 08
- PRLoss of Primary Containment NotificationIOGP 510 · 05 · EI PSM · 19
- PROperating Manual: Life Saving EquipmentRegionIOGP 510 · 05 · EI PSM · 14
- PROperating Procedure: Seawater SystemIOGP 510 · 07 · EI PSM · 08
- PROperating Procedure: Open and Closed DrainsIOGP 510 · 07 · EI PSM · 08
- PROperating Procedure: Inert Gas SystemsIOGP 510 · 07 · EI PSM · 08
- PROperating Procedure: Diesel Oil SystemsIOGP 510 · 07 · EI PSM · 08
- PROperating Procedure: Heating Medium SystemIOGP 510 · 07 · EI PSM · 08
- PROperating Manual: Power Generation and DistributionRegionIOGP 510 · 07 · EI PSM · 08
- PROperating Procedure: Water Injection SystemAssetIOGP 510 · 07 · EI PSM · 08
- PRRe-instatement and Recommissioning of Plant and EquipmentIOGP 510 · 08 · EI PSM · 13
- PRHazardous Leak ReportingIOGP 510 · 09 · EI PSM · 19
- PRInstallation Emergency Response PlanAssetIOGP 510 · 07 · EI PSM · 14 · Safety Case · Emergency & EER
- PROperational Risk Assessment for Impaired Safety and Environmental Critical ElementsIOGP 510 · 05 · EI PSM · 16
- SULift Plan and Hazard Identification FormIOGP 510 · 07 · EI PSM · 17
- SUTemporary Equipment Pre-mobilisation ChecklistIOGP 510 · 08 · EI PSM · 13
- SUStation BillAssetIOGP 510 · 08 · EI PSM · 14
- SUOperational Readiness Review Report TemplateIOGP 510 · 09 · EI PSM · 13
- SUArea Log SheetsAssetIOGP 510 · 09 · EI PSM · 09
- KBMechanical Isolation GuidanceIOGP 510 · 02 · EI PSM · 17
- KBFlare Management PlanIOGP 510 · 07 · EI PSM · 08
- KBArc Flash Hazard Management GuidelineIOGP 510 · 08 · EI PSM · 17
HSSE 13
- POLife Saving RulesIOGP 510 · 01 · EI PSM · 01
- PRContractor HSSE ManagementIOGP 510 · 01 · EI PSM · 18
- PROffshore Oil Pollution Emergency PlanIOGP 510 · 07 · EI PSM · 14
- PROnshore Terminal Emergency Response PlanIOGP 510 · 07 · EI PSM · 14
- PRSevere Weather Action PlanIOGP 510 · 07 · EI PSM · 14
- PRIncident Management PlanIOGP 510 · 07 · EI PSM · 14
- PRStatutory Reporting of Incidents and Regulatory Non-CompliancesIOGP 510 · 09 · EI PSM · 19
- SUContractor Management Activity AssessmentIOGP 510 · 04 · EI PSM · 18
- SUEvacuation Reception Centre ChecklistsIOGP 510 · 06 · EI PSM · 14
- SUEvent Investigation Report TemplateIOGP 510 · 09 · EI PSM · 19
- SUCombined Operations Interface Document TemplateIOGP 510 · 04 · EI PSM · 10
- KBContractor Management GuidelinesIOGP 510 · 04 · EI PSM · 18
- KBEmergency Response GuidanceIOGP 510 · 07 · EI PSM · 14
Commercial 9
- POContractor Management PhilosophyIOGP 510 · 01 · EI PSM · 18
- STMarine Operations and Vessel Assurance StandardIOGP 510 · 02 · EI PSM · 18
- STAnchor Handling and Tow Vessel StandardIOGP 510 · 02 · EI PSM · 18
- PRLogistics HSE CaseIOGP 510 · 05 · EI PSM · 18
- PRContractor HSE Risk Assessment ProcessIOGP 510 · 05 · EI PSM · 18
- PRAviation ProcedureIOGP 510 · 07 · EI PSM · 18
- PRHelicopter Operations ProcedureAssetIOGP 510 · 07 · EI PSM · 18
- PRVessel Collision ProcedureAssetIOGP 510 · 07 · EI PSM · 14
- KBOffshore Marine Operations GuidelinesIOGP 510 · 08 · EI PSM · 18
Subsurface 3
- STSleeve Movement StandardAssetIOGP 510 · 02 · EI PSM · 08
- PRWell Interventions Delivery ProcessIOGP 510 · 05 · EI PSM · 08
- PRWell Testing ProcedureAssetIOGP 510 · 08 · EI PSM · 08
Wells 8
- STWell Control StandardsIOGP 510 · 02 · EI PSM · 11
- STWell Intervention Delivery StandardIOGP 510 · 02 · EI PSM · 11
- PRContractor Management for Drilling and Well ActivitiesIOGP 510 · 04 · EI PSM · 18
- PRPressure Control Manual for Drilling, Completions and InterventionIOGP 510 · 05 · EI PSM · 08
- PROperational Readiness Review ProcedureIOGP 510 · 07 · EI PSM · 13
- PRH2S ProcedureIOGP 510 · 07 · EI PSM · 08
- PRWell Acceptance and Handover ProcedureAssetIOGP 510 · 07 · EI PSM · 13
- KBWell Control GuidelinesIOGP 510 · 08 · EI PSM · 11